July 1st, 2003 EPA reissued the Construction General Permit
(CGP) to extend coverage to construction sites that disturb
one or more acres, including smaller sites that are a part
of a larger development. These sites are required to have
a Storm Water Pollution Prevention Plan (SWPPP). A SWPPP is
a written document, which is broader and more complicated
than a typical erosion and sediment control plan that describes
the construction operator's activities to comply with the
requirements in the CGP. soil-tek of Mid America keeps development
sites in compliance with not only the EPA's regulations but
local regulations as well by using a project management plan
that includes:
- SWPPP Creation
- Secure on-site storage of SWPPP and other
necessary documents that can be monitored by soil-tek inspectors
24 hours a day.
- Initial SWPPP updating and continued updating
throughout the life of the project
- EPA required on-site inspections every 7 days
and 24 hours after any rainfall greater than a 1/2 inch
- Maintenance and installation when needed
|